Qualified Materials List
Aggregate Base
     Clark County  >  Departments  > Public Works  >  Inter-Agency Quality Assurance Committee
SOURCE LOCATION QUALIFIED UNTIL RESPONSIBLE MEMBER MAXIMUM DENSITY C OPTIMUM MOISTURE SOLUBLE SULFATES %
Aggregate Industries Southwest Lake Mead Pit 3/31/2018 CCPW 144.4 5 0
Aggregate Industries Southwest Sloan Quarry 3/31/2018 CCPW 146.8 6.2 0.01
Aggregate Industries, SWR Sloan Recycle Black Type II 3/31/2018 CCPW 137 6.1 0.01
American Eagle Ready Mix Sloan/Dixon Pit (50% Recycle Concrete ) 3/31/2018 CCPW 123.5 9.7 0.01
Boulder Sand & Gravel Hollywood Pit Native Type II 3/31/2018 CCPW 137 8 0.07
Boulder Sand & Gravel No.5th Crusher Recycled Concret 70% Asphalt 30% 10/31/2017 CLV 126 10 0.085
Capriati Construction St. Rose & Bermuda 3/31/2018 COH 134 9.5 0.06
CEMEX Bullhead,AZ 3/31/2018 CCPW 127.5 7.3 0
Impact Sand & Gravel/CTC Crushing BRQ Pit 3/31/2018 COH 133.7 7.2 0.01
Impact Sand & Gravel/CTC Crushing Cactus & Maryland Parkway(Recycled 100% ) 10/31/2017 CCPW 132 10 0.05
Impact Sand & Gravel/CTC Crushing Inspirada Master Planned Community ONLY 3/31/2018 COH 131.4 6.9 0
Impact Sand & Gravel/CTC Crushing Jericho Pit 3/31/2018 COH 131.9 7.6 0.02
Impact Sand & Gravel/CTC Crushing Moccasin Pit 11/30/2017 CCPW 133.2 7.8 0.03
Las Vegas Crushing Nevada State College Crusher 3/31/2018 CCPW 136 9 0.01
Las Vegas Paving Apex Landfill Pit 3/31/2018 CCPW 135.3 8 0.01
Las Vegas Paving Blue Diamond 3/31/2018 CCPW 136.9 7.3 0.01
Las Vegas Paving Blue Diamond Recycled Asphalt (20% Recycle Asphalt) 3/31/2018 CCPW 132.8 6.6 0.1
Las Vegas Paving Lhoist Pit 3/31/2018 CCPW 140.2 6.5 0.01
Las Vegas Paving Lone Mountain Road & I-215 3/31/2018 CLV 144.7 6.4 0
Las Vegas Paving Lone Mountain Road & I-215 (15% Recycle Asphalt ) 3/31/2018 CLV 140.2 7.2 0.01
Las Vegas Paving Lone Mountain Road & I-215 (25% Recycle Concrete ) 3/31/2018 CLV 140.2 7.9 0.02
Las Vegas Paving No. 5th Recycled Concrete (40 %Recycle Concrete) 3/31/2018 CNLV 128.6 9.5 0.12
Las Vegas Paving North 5th St. 25% RAP 3/31/2018 CNLV 135.9 6.6 0.16
Las Vegas Paving Skye Canyon 3/31/2018 CCPW 144 7 0.01
Las Vegas Paving Sunset Recycled Concrete (30%) 3/31/2018 COH 128.4 9.3 0.22
Las Vegas Paving Sunset RecycledAsphalt 20% 3/31/2018 COH 130.3 9.1 0.16
Leavitt Pit Overton, NV 3/31/2018 CCPW 135.7 7.7 0.12
Mel Clark Inc. Mel Clark Inc. Pit (Lone Mtn) 3/31/2018 CLV 142.8 6.7 0.01
Portable Aggregate Producers Eldorado Pit 3/31/2018 CCPW 132.5 8.6 0
Precision Aggregate Products, LLC BLM Community Pit in Mesquite 3/31/2018 CCPW 136.6 6.6 0.13
RAMM Construction Ann Road Crusher 3/31/2018 CLV 138.9 6.5 0.04
Rees's Enterprises Mesquite BLM Pit 3/31/2018 CCPW 138.1 5.3 0.15
Rice Construction Shaumber ( West Side Sand and Gravel Pit) 3/31/2018 CLV 146 5.9 0
S & S Concrete & Materials Pass Canyon, Bullhead City, AZ 3/31/2018 CCPW 128.2 6.7 0.01
VT Construction Moapa Tribal Pit 3/31/2018 CCPW 134.9 8.5 0
VT Construction The Canyons @ McDonald Ranch Site Only 3/31/2018 CCPW 128.5 7.5 0.25
VT Construction Village #16 Reverence 3/31/2018 CCPW 136.3 7.2 0.01
VT Construction Village #17 Master Planned Community ONLY 3/31/2018 CCPW 140.1 8.5 0.01
Wells Cargo Lone Mountain Pit 3/31/2018 CLV 144.6 7.1 0
Wells Cargo Spring Mountain North Pit 3/31/2018 CLV 144.5 5.9 0
Westpoint Rock Product West Point Moapa 3/31/2018 CCPW 140.5 7 0.04